PR checks in the Hermes core: what our catalog repin goes through¶
This note describes the path of a pull request in NousResearch/hermes-agent from opening to
merge — using our PR #138527 (a repin of
the hermes-mobile plugin-catalog entry) as the example. The data was read from the live PR on
16 October 2026.
In short: three gates before merge¶
| Gate | Who | What it checks | How it looks in the PR |
|---|---|---|---|
| 1. Runs allowed | a maintainer clears the first-run gate | that the PR may execute on runners at all | until approved every run reports action_required |
| 2. Runs (5 workflows, 52 checks) | repository automation | that the change does not break the core and is valid for the catalog | 28 ✅ / 24 ⏭, zero failures |
| 3. Review and merge | a maintainer | the content of the change | reviewDecision non-empty → the merge button becomes active |
The important part: green runs do not merge anything by themselves. Without a review GitHub
keeps mergeStateStatus = BLOCKED even when every check passed.
Gate 1. Someone has to allow the runs¶
For a first-time contributor the first workflow run needs a maintainer's approval — that keeps
foreign code from executing on runners. Until then every run reports completed / action_required
(no work done), and gh pr checks prints an empty list — which is why “no checks” does not mean
“no checks required”.
In our case a maintainer cleared it: the ci-reviewed label appeared on 16 October at 07:13–07:16
UTC, and the runs completed on their second attempt (run_attempt: 2).
Gate 2. What actually runs¶
Five workflows on the PR head (fb502e35…, our repin):
| Workflow | Result | What it proves |
|---|---|---|
| Plugin Catalog CI | ✅ success | the catalog entry is structurally valid and the pin points at an existing commit |
| CI | ✅ success | the change breaks nothing: lints, Python tests, OS-specific suites, JS/TS, Rust, docs and dozens of structural checks |
| Docker Build, Test, and Publish | ✅ success | the image builds and passes its tests (nothing is published from a PR) |
| Nix flake check | ✅ success | the Nix build is reproducible |
| Label rerun | action_required |
repository automation (relabel-triggered rerun), unrelated to our change |
Plugin Catalog CI — the part that concerns us directly¶
Two jobs, both green:
structural— entry shape: required fields,shaformat, versions,tier/category/requires_hermesconsistency;pinned-source-validate— the pin resolves to a real commit in the declared repository and the declaredsubdircontains a plugin manifest (plugin.yaml) whoseversionmatches the catalog entry.
Those two answer “the entry is neither stale nor broken”: our pin 91bdca08… (plugin 1.1.1) passed
them.
CI — the large run (what is inside)¶
CI is a composite workflow pulling in 25 nested check sets. All of them finished successfully; for
orientation, what was exercised:
- Python lints:
ruff enforcement,ruff + ty diff,code health ratchet,Windows footguns; - Python tests:
Run tests (1/2),Run tests (2/2),Python tests / e2e,e2e-upgrade,e2e-upgrade-plan; - OS-specific: macOS tests (2 parts), Windows tests (regular and arm64, 2 parts each),
Windows install + update E2Edriving real processes; - JS and Rust:
JS & TS checks,Rust tests; - Structural/repo-wide: large binaries, contributor attribution, committed infographics, file-name
case collisions, common history with the base branch, icon freshness, production imports of the
tools.lazy_depsstub, profile artifacts,prompt surface diff,Supply-chain scan, remote terminal backends; - Dependencies:
uv.lock,package-lock.json diff,lockfile-diff; - Docs and build:
Docs Site,Bootstrap installer,Lint Docker scripts; - Desktop:
Desktop E2E,Desktop core E2E,Desktop update E2E— conditional (see below); - Final:
All required checks pass (v2)— the summary check GitHub itself uses for merging.
Why some checks are “skipped”¶
24 of the 52 checks report ⏭ skipped — that is neither a failure nor an oversight: they are
conditional steps that only run where they apply (docker image build and publish, release-manifest
publishing, desktop E2E, the full OS matrix on release branches). For a three-line change in a
catalog entry they do not apply, and skipped is the expected outcome.
Gate 3. Review and merge¶
Checks are green, but the merge is held by:
mergeable = MERGEABLE— no conflicts with the base branch;mergeStateStatus = BLOCKED— waiting for a review;reviewDecisionempty, no reviews or inline comments.
What the maintainer needs to do: look at the entry diff (three lines — sha, version, an extended
description) and submit a review. After that the merge button becomes available.
What this means for our PR¶
- We changed exactly three lines in
plugin-catalog/hermes-mobile.yaml; no core code was touched. - The substantive part is the two catalog checks (
structural,pinned-source-validate); the rest proves we broke nothing in the core. - Until the PR is merged the production pin does not move:
mainstill carries1.0.0 @ 7fdaf232…, so installing the plugin by name gives 1.0.0 rather than our 1.1.1. - After the merge: update the plugin on already-installed agents —
hermes plugins update hermes-mobile.
Checking the state yourself¶
gh pr view 138527 --repo NousResearch/hermes-agent \
--json state,mergeable,mergeStateStatus,reviewDecision,headRefOid
gh pr checks 138527 --repo NousResearch/hermes-agent # checks of the head commit
gh api repos/NousResearch/hermes-agent/commits/<sha>/check-runs --jq '[.check_runs[].conclusion] | group_by(.) | map("\(length) × \(.[0])")'
Worth remembering: gh pr checks only lists checks that have already started. While runs wait for
approval the output is “no checks reported” — a state of waiting, not an empty requirement list.